We got through another weekend. We made some real progress on the wiring front. We have most of the home runs back to the panel done now. We still have the run for the dishwasher and the run for the radiant heat in the master bath. That should do it for our 12/2 runs though. Then we just have to do the big wire to the hvac system and the dryer. We should be able to finish up the wiring in the house this week. We are really only lacking the runs from the lights back to the switches so it should take to long to get that wrapped up.

Down to the panel

Through the garage

Into the house through the 3 inch pipe




In other news a culvert pipe showed up in the parking lot at work a few weeks back. It is about 10ft long with a 1.5ft inside diameter. They have been doing road construction in the area so I figured it belonged to them. I finally found a guy working on our side of the road and he said it didn't belong to them so I hauled it out to the house. I plan to build the low area of the drive up so it wont get washed out by a heavy rain.



We also made a trip to the home show and talked to a few garage door companies. We really want to look of wood without the maintenance  We may go with something like this. It's not perfect but it fits the budget much better than the fiberglass doors. 


We also had some great weather for January. They finished getting the doors put in this week, but the weather was so decent we ended up just leaving them open most of the weekend. It was pretty breezy on Saturday and it did a pretty good job of getting the mud dried up. We got some dirt work done and we should get a bit more done later in the week.  