Monday, April 1, 2013

Painting, wood floor, lighting

We got our panel wired up. I spent most of the weekend working on installing outlets and switches. I ran into a small issue with a 4 way but either way we have light and that is awesome. My wife and her family worked on painting on Saturday and they managed to get 10 gallons put on the walls. We are about 6-7 short though. The hickory floor came in so we went and picked up all 5000 pounds worth. We should be able to start on that by next weekend at the latest.




2 comments: