Wednesday, March 13, 2013

Drywall progress

The drywall is nearly hung now. The finisher was going to start today or tomorrow. The end is near now.







In other news I got my hole at the bottom of the drive way dug. It was nearly 10ft deep when I quit digging. I didn't find any rocks which is extremely rare for this area. I burried most of the concrete after lunch on Saturday. I can fit more in the hole but we may use some of it for other projects. I finished up just as it started to rain. We got nearly 2 inches and my hole turned into a flooded mess.



The next project is to get the stone veneer installed on the front of the house. Unfortanatly it looks like half our weekend is going to be rained out. We ordered it from a company out of Springfield called Palisades Stone. They should be delivering it tomorrow.


 

Monday, February 4, 2013

Garage floor is done, HVAC started

We finished up getting the garage gravel leveled up and we had a few days in the 60's so we had the concrete guys come and get the garage floor poured.


I also spent a few hours on Friday getting the steps built for the garage. This was my first go at doing the math for the stringers but it turned out just fine.



The HVAC guys also started last week. They have the main trunk line in and most of the ducting in. They should finish up the return air and the HRV in the next day or so.



Thursday, December 20, 2012

Whoops! chimney and plumbing before the metal rooof

My roofer called me last week and told me the metal would be in by Thursday and that they may want to start getting it put up. The weather has been unbelievably nice for December. It seems like just about every day has been rain free and in the 60s and 70s. It could easily be 20 degrees with snow on the ground. So the roofers were understandably ready to get this job started. Fortunately I talked to my framer and he reminded me that I would want to have all my roof penetrations in before the metal goes on... Whoops. So I called the roofers off. Fortunately I have a plumber who is pretty easy to work with and he got out and put in our 3 vents that we needed. My father-in-law and I spent Half the weekend getting the chimney stuff figured out. Part of the problem is I am not sure what stove we are going to go with. So we took the minimum clearances for single wall stove pipe and added a couple inches. Hopefully that will do the job.



We spent the rest of the weekend adding fill to the garage. They are building a new CVS in town and they needed a place to get rid of the chunks of concrete so our property was volunteered. It has been a lot of work hauling this into the garage but it will save as thousands in the end. We also got more concrete than we bargained for. It will all work out in the end but right now the pile looks like a monster. We have been using the old backhoe to bring in a couple of large peices at a time. It has been extremely time consuming, but I think we are almost there. One more full day and we should be ready to pour the garage floor. The weather may not hold though, and that will push it back to spring.