We are down to lots of small jobs at this point. The well is in and the pressure tank is set. Unfortunately the plumber didn't stub out a place for us to tie in at. I finished up the shower pan for the master bathroom and Calee got the tile laid on the floor of the shower. We finished up the heated floor in the master bath and laid the tile in both bathrooms. Now we just have to finish up the shower walls.










The cabinet guys got most of the cabinets set. The counter top guy came and got the kitchen measured. I am going to do concreted for both the bathrooms.

After 2 weekends with a paint sprayer we finally got all the trim painted. We finished trimming a couple windows yesterday. We also finished up the stairs.